Installation Process
From Order to Operation - The steps we take care of for the full installation of your generator system.
1. Order filled from stock or supplier.
2. Site prepared to set Generator – Level ground – apply suitable base material. Larger models require a concrete pad.
3. Set Generator and Propane tank (if required).
4. Connect generator to fuel source.
5. Wire generator to ATS (Automatic transfer switch).
6. Power is interrupted to connect ATS to main panel or sub panel.
7. Check final check completed and test preformed.
8. Full clean up of site.
9. Control is in your hands, you are totally prepared for the next outage.